For use with poured deck (floor) in high-rise construction, these boxes are installed on wooden or steel concrete forms and after the forms are removed, the box is flush with the concrete
Warranty
1 Year
Features
Flat sides provide excellent contact for locknuts
External ears are used to nail the ring to the wood form
Top cover is removable for before-pour work
Waxed fixture ears prevent concrete from interfering with the threads